South Dakota Construction Work

Saturday, June 27, 2020

PIPE WORK AND TURN LANE CONSTRUCTION IN BUTTE COUNTY

CHIP SEAL & FOG SEAL PROJECTS IN THE YANKTON AREA

I-190 EXIT 1B NORTHBOUND TO EASTBOUND ON RAMP CLOSING

GUARDRAIL WORK TO BEGIN ON INTERSTATE 90 EAST OF SPEARFISH

BRIDGE WORK TO BEGIN ON INTERSTATE 90 EAST OF WALL

HIGHWAY 183 LOAD RESTRICTION

ASPHALT PAVING ON HIGHWAY 85

CULVERT REPLACEMENTS IN BUTTE COUNTY

I-29 Exits 242 and 246 Interchange Ramp Construction

CONCRETE SURFACE REPAIRS STARTING BY HERMOSA

BRIDGE WORK TO BEGIN ON INTERSTATE 90 AT EXIT 98

INTERSECTION OF HIGHWAY 10 AND 8TH AVENUE WEST IN SISSETON TO BE CLOSED

I-29 Exit 246 Interchange Ramp Closing for Construction

HIGHWAY 27 EAST OF LANGFORD CLOSING FOR CONSTRUCTION

CONSTRUCTION ON HIGHWAY 18 NORTH OF PINE RIDGE

CULVERT REPAIRS AND REPLACEMENTS IN BUTTE & MEADE COUNTIES

CHIP SEAL PROJECT ON HIGHWAYS 34 AND 79

CONSTRUCTION WORK ON HIGHWAYS 79 AND 18

CHIP SEAL AND FOG SEAL PROJECT ON HIGHWAYS 16A AND 18

HIGHWAY 25 GRADE RAISE

Chip Seal and Fog Seal Projects in the Sioux Falls Area

BOX CULVERT INSTALLATION EAST OF NISLAND

Intersection Improvements on US Highway 16 at Croell (Perli) Pit

U.S. Highway 212 Work to Switch Lanes in Watertown

Pavement Marking Project on Sturgis Road

Structure Replacement Project to Begin Near Whitehorse

WORK BEGINS ON EAST NORTH STREET- RAPID CITY

Rail Crossing Work on Highway 18 in Canton

INTERSECTION IMPROVEMENTS ON HIGHWAY 16 AT COSMOS ROAD

Department of Transportation Receives Federal Funds for Local Bridges

Milling and Asphalt Paving to Begin West of Pierre/Ft. Pierre

Highway 37 Project Work to Resume

Asphalt Concrete Crack Seal and Leveling

HIGHWAY 12 CULVERT WORK

© 2015 Dakota Asphalt Pavement Association Inc.
3030 Airport Road, Suite B
Pierre, South Dakota 57501
Ken Swedeen - Executive Director
605.224.8500 (phone)
877.226.7511 (toll free)
Online Payment